英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:

floorman    
n. 门警

门警


请选择你想看的字典辞典:
单词字典翻译
floorman查看 floorman 在百度字典中的解释百度英翻中〔查看〕
floorman查看 floorman 在Google字典中的解释Google英翻中〔查看〕
floorman查看 floorman 在Yahoo字典中的解释Yahoo英翻中〔查看〕





安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • Responsibilities of the Floorman - IADC. org
    Responsibilities of the Floorman Keep tongs properly balanced and greased Lubricate all hinge pins The one between the tong head and handle is most important Adjust the tong counter weight as needed Don’t tie additional weight to tong counterweight Keep the tongs level and adjust as needed Keep good pins and dies in tongs
  • The Floorman - IADC. org
    The Floorman There are a number of titles for Floorman (or Rotary Helper as some call him) One is the Lead-tong man, another is the Make-up tong man, and another is the Pipe Racker Each of these workers has specific duties while working on the rig floor but they must work together in preparing for a trip and when making the trip
  • Alert 03 – 03 Floorman Struck by Tongs Results in LTI
    The floorman was called away to help with another task and upon returning, continued to work his pipe racking position When he returned hevi-wate pipe was being pulled out of the hole The floorman again assisted with the break out tongs and when the Driller kicked in the rotary to back out the stand, the tongs snapped toward the injured to
  • Drilling Industry Training (DIT) - IADC. org
    Rig Floorman Rig Inspection Rig Move Incident Prevention Rig Roustabout Rope Access Safe Cargo Handling Safety Leadership Through Emotional Intelligence Scaffolding Inspection, Erection and Dismantling Scaffolding Inspector Spill Prevention Control Countermeasure Stuck Pipe Avoidance Stuck Pipe Prevention Train the Trainer Skills
  • HAZARDS OF CASING OPERATIONS - IADC. org
    6 Floorman struck by dropped casing bales using braided cable sling with sliding, open-throated hook to pick -up (2) 18-ft bales at once and lay-down across rig floor (Inadequate rigging Improper rigging)
  • Floorman arm pinned by Pipe Handling Equipment ALERT 12-21 - IADC. org
    Floorman arm pinned by Pipe Handling Equipment ALERT 12-21 WHAT HAPPENED: The drilling crew were tripping the drill string into the primary well with two floormen positioned in the fingerboard area to spot open fingers manually as required The rig’s pipe handling equipment (PHE) was being used to
  • Alert 21-12 Floorman arm pinned by Pipe Handling Equipment
    The rig’s pipe handling equipment (PHE) was being used to transfer stands from the fingerboard area to well centre The Injured Party (IP), a floorman was positioned at the upper derrick level tying a finger latch in the open position It was at that time that…
  • Rig Floor Safety Tips - IADC. org
    The floorman’s hands should never be close to a joint in the jaws of the tongs One hand should be on the handle of the lead jaw and one hand on the handle of tongs while coming out of the hole While going in the hole, hands should be on the jaw handles Crew members should examine tong lines for proper clamps and frayed ends of cables each
  • Alert 05 – 08 LTA – Floorman Struck by Snub Line - iadc. org
    Alert 05 – 08 LTA – Floorman Struck by Snub Line WHAT HAPPENED: Operations were in progress to retrieve a storm packer set at 364’ RKB with 121 stands 5” drill pipe hung below the packer The storm packer-retrieving tool was made up to the first stand of drill pipe and three more stands of drill pipe were run
  • SLIPPING AND CUTTING DRILL LINE - IADC. org
    drill line slipped out of the clamp device and the line fell striking a floorman on the hardhat and shoulder WHAT CAUSED IT: Employee was allowed to stand under a hoisted load CORRECTIVE ACTIONS: • Do not allow personnel to work or stand under hoisted loads





中文字典-英文字典  2005-2009